Omran Rahsazan Shahin Company
Omran Rahsazan Shahin Company, with more than 23 years of brilliant experience in the field of road and bridge construction, is one of the leading companies in this field. This company has successfully completed numerous projects using modern technologies and an experienced team.
Produced segmental parts
Moallem unlevel intersection
Produced segmental parts
Qaramalek unlevel intersection
Job creation
directly and indirectly
Why segmental technology?
Robust, fast, economical, reliable and durable.
Durability and longevity
Segmental bridges have a longer service life and greater resistance to environmental conditions.
Reducing construction costs
Due to the high quality of construction and greater durability, maintenance and repair costs are reduced.
Carrying and installing parts
Factory-made prefabricated parts are transported to the installation site, speeding up the project implementation.

Cooperation with Omran Rahsazan Shahin Company
To contact us and collaborate with us, enter your contact number and name in the form. Our colleagues will contact you as soon as possible.

همکاری با شرکت عمران راه سازان شاهین
جهت ارتباط با ما و همکاری با ما شماره تماس و نام خود را در فرم ثبت کنید همکاران ما در اولین فرصت با شما تماس خواهند گرفت.
About segmental technology
The beginning of a technological change
One of the highlights of these bridges is the use of segmental technology.
Segmental technology has several advantages in bridge construction, including:
- High construction speed: Prefabricated parts are manufactured in the factory and transported to the installation site, which increases the speed of project implementation.
- High construction quality: Producing parts in a controlled factory environment improves construction quality and dimensional accuracy.
- Reduced traffic and disruptions: Due to the high speed of installation, the duration of traffic routes is minimized.
- Durability and durability: Bridges built with this technology have a longer useful life and are more resistant to environmental conditions.
- Lower maintenance costs: Due to the high quality of construction and greater durability, maintenance and repair costs are also reduced.
National production
IRAN
Communication routes
Contact information
info@omranrahsazan.com 04133295341
Address
Tabriz, Valiasr, Rodaki square, in front of Kasab restaurant, No. 9
Working hours
Working days: Sat to Wed
Working hours: 9am to 8pm
Shohada Qaramalek Unlevel intersection
This project, which was being implemented in western Tabriz with the aim of smoothing traffic and paying attention to underserved areas, was now put into operation during the government week, after several months of round-the-clock activity since the project began.
پل قراملک دومین پل سگمنتال کلانشهر تبریز
1 of 1Technical specifications of the Qaramalek Unlevel Intersection
Bridge deck length
240 meters
Bridge deck width
21.2 meters
Area
5,300 square meters
Number of bases
14 pieces





